Power Outage Recovery
Pre-Outage Tasks
- Push out fix for systemd bug. This will ensure that all CentOS systems boot “normally” after a reboot.
Networking
Start 7:30am -Rick
- Brocade 7450-1 A4:
- Replace Power Supplies with correct airflow x2
- Replace Fans (Front to Back air flow) x2
- Replace 10GB Fiber Module with 10GB Copper Module
- 10GB Cable Runs
F6 to A4Done- E6 to A4
- Reconfigure Switches in Rows E & F to connected corresponding RaG and remove connections to RaG D5
- Reconfigure SAN Switch
- Move JWD Cisco Rack to Row F7 (Power?)
- Test
Updates
- OS package updates for coresrv servers
- Update New Wiki (dokuwiki) software