Power Outage Recovery

Pre-Outage Tasks

  • Push out fix for systemd bug. This will ensure that all CentOS systems boot “normally” after a reboot.

Networking

Start 7:30am -Rick

  • Brocade 7450-1 A4:
    • Replace Power Supplies with correct airflow x2
    • Replace Fans (Front to Back air flow) x2
    • Replace 10GB Fiber Module with 10GB Copper Module
  • 10GB Cable Runs
    • F6 to A4 Done
    • E6 to A4
  • Reconfigure Switches in Rows E & F to connected corresponding RaG and remove connections to RaG D5
  • Reconfigure SAN Switch
    • Move JWD Cisco Rack to Row F7 (Power?)
    • Test

Updates

  • OS package updates for coresrv servers